Waterside property owners wishing to have lake or river access, can receive a personal service from TMS to create the ideal landing stage or jetty.
As a professional competent marine contractor, we are able to advise, seek necessary permits and consents, design and build any type of above or below water structure.
A large choice of natural materials, many indigenous to the local area, can enhance the property’s appeal and value, whilst providing endless enjoyment for the owner and guests.
Latest Projects
Sharpness Pier Repairs, Sharpness Dock
For Canal River Trust, Kier
Sharpness South Pier is located downstream of the outer gates (sea gates) to Sharpness Tidal Basin. The pier is
effectively located within the River Severn, at the point where the river meets the Gloucester & Sharpness Canal. The
function of both north pier and south pier is to guide ships into the Tidal Basin from the River Severn
In June 2020 the MV Lady Adele (photo inset) on arrival at Sharpness Port contacted the South Pier at Sharpness.
As a result of the vessel impact, the South Pier sustained damage which required urgent inspection as-well-as removal of
seabed debris and loose elements that may become detached in the near future.
Stonehaven Pier Reconstruction
For Aberdeenshire Council
Working on behalf of Aberdeenshire
Council, TMS were appointed as Principal Contractor
to construct three new pier heads around three
historic ones in Stonehaven Harbour. The three new
pier heads were to encapsulate the existing Net Pier,
South Pier and Fish Jetty structures which had all
been considered to have reached the end of their
serviceable life and were at risk of failure if their
condition were allowed to degrade further. The full
scope of the project included: