BAE Deep Water Berth, Glasgow

For Farrans Construction

2021 - 2022

TMS were appointed by Farrans Construction to undertake the Deep
Water Berth Deepening Works for BAE Systems in Glasgow, which took
a total of 14 months to complete.
The scope of the project included:
• Initial Backhoe Dredge of 27,000m3
• Precast concrete breakout and removal
• Rock breakout to revised berthing pit depths to accommodate
precast concrete to -11m CD
• Bed levelling
• Precast concrete placement
• Underwater In-situ Concrete
• Re-siltation Completion Dredge

View Project