Pipe Laying, Polperro
For South West Water Ltd
A new sewage outfall to be laid from a rock mounted Pumping Station onshore and stretching 900 metres out to sea.
A new sewage outfall to be laid from a rock mounted Pumping Station onshore and stretching 900 metres out to sea.
As part of Somerset’s flood defences, TMS were called in to replace a failing outfall head wall along the bank of the estuary at Tuckett’s Clyce in Somerset.
South West Water had a requirement for the existing outfall pipe located at Teignmouth’s East Cliff beach to be removed, having reached the end of its design life.
The existing 435m Outfall Pipe that ran across Saundersfoot Beach in South West Wales had been exposed by weather and sea conditions which had caused damage to the pipe. The damage caused meant that there was a requirement for the existing pipe to be removed and replaced by a new 289m long 355mm OD HPPE SDR17 pipe weighted into position with a combination of concrete collars & mattresses.